MSHA Final Report Issued for Fatality on 3/12/2021
October 18, 2021 - On March 12, 2021, a miner was fatally injured while attempting to insert a steel pin into a spud beam.
Best Practices
-
Always assure hoisted equipment movement has stopped and the hoist operator has set the brake before working on hoisted equipment.
-
Assure the hoist operator can see miners working on hoisted equipment.
-
Establish an effective communication protocol, which includes confirmation of instructions, between the hoist operator and miners working on hoisted equipment.
-
Position yourself in a safe location to maintain balance and protection from any energy of cantilevering tools or objects.
-
Stay in a Safe Zone when working around cables and sheave wheel systems.
-
Always maintain a work area that is clean and clear of debris.
-
Train equipment operators in the safe performance of their tasks and potential hazards.